Selected Projects

Project experience
across Qatar.

Real project photography and a summary of the work carried out at each location.

01
Vinyl Sticker Works

Ministry of Sports and Youth

Vinyl sticker application works were carried out within the lift lobby area, with careful alignment and surface finishing around architectural panels and lift surrounds. The work was executed to achieve a clean, consistent appearance while coordinating around the existing interior finishes.

02
Cabinet Works

North Oil Tower

Custom cabinet works were completed for the North Oil Tower, providing practical built-in storage with clean alignment and a consistent finish. The scope included cabinet installation, hardware fitting and final adjustment to suit the office environment.

03
Marble Flooring Repair & Replacement

Ministry of Education and Higher Education

Localized marble flooring repair and replacement works were carried out to restore damaged areas while maintaining the visual continuity of the surrounding floor. The work involved careful removal, fitting and finishing of marble sections within the existing floor pattern.

04
Renovation Works

Gloria Travels, Old Airport

Interior renovation works were completed for Gloria Travels at Old Airport, with the scope coordinated around the existing office layout and operational requirements. The project focused on improving the interior environment through practical renovation and finishing works.

05
Glass Partition Works

Mastercard Office

Glass partition works were completed within the Mastercard office to create a clean, open and contemporary workplace environment. The installation was coordinated with existing flooring, walls and office furniture for a precise and unobtrusive finish.

06
Domestic Water Piping Re-routing

The Pearl-Qatar, Tower 14

Domestic water piping was re-routed within the ceiling service zone at Tower 14, The Pearl-Qatar. The work required careful access and coordination around existing services to modify the pipe route while maintaining an organized service layout.

07
Roof Shade Works

Villa 28, The Pearl-Qatar

A roof shade structure was installed at Villa 28, The Pearl-Qatar, together with the associated ground and paving preparation around the installation area. The completed shade provides functional weather protection while integrating with the villa exterior.

08
Shelf Installation

UBC Store

Storage shelving was installed for the UBC Store to provide an organized and practical back-of-house storage solution. The shelving was positioned and assembled to make effective use of the available space while maintaining clear access.

09
FCU Installation

Galeries Lafayette, Katara

Fan Coil Unit (FCU) installation works were carried out at Galeries Lafayette, Katara. The scope involved installation and coordination within the existing ceiling and building-services environment, with attention to access and surrounding finishes.

10
21 Display Board Installations

Exhibition Hall, Katara

A total of 21 display boards were installed at the Exhibition Hall, Katara, for the Supreme Committee for Delivery & Legacy. The installation was coordinated across the exhibition space to maintain consistent positioning, alignment and presentation quality.